info@michos.gr   +30 210 6774 280
Our projects

Wastewater aeration system, Mykonos WWTP

Wastewater aeration system, Mykonos WWTP

Wastewater treatment plant constructed for a capacity of 32,000 equivalent inhabitants.

 

  • MICHOS SA installed and commissioned an aeration system with 10 lobe blower units with a total installed power of 600kW and fine bubble plate membrane diffusers in phases A and B.
  • 
It is worth noting that MICHOS SA has installed similar aeration systems with blowers and diffusers in most waste water treatment plants in Greece, as well as in Bulgaria and Cyprus.


 

 

A WIDE RANGE OF CLIENTS WHO TRUST US

Head Office: (Map) Thesi Kyrillos Attiki Odos Motorway, Exit 4 (Aspropyrgos Interchange) GR-19300 Aspropyrgos, Greece T : +30 2106774280 F : +30 2106775533 Email : info@michos.gr

Athens Service Center: (Map) Thesi Kyrillos Attiki Odos Motorway, Exit 4 (Aspropyrgos Interchange) GR-19300 Aspropyrgos, Greece T : +30 2106774280 T(24/7) : +30 2100101616 Email : info@michos.gr

Thessaloniki Service Center: (Map) Industrial Area Thessaloniki – 2 Str. -Block 13 GR-57022 Sindos Thessaloniki-Greece T +30 2310948565 F +30 2310948565 Email: info@michos.gr

cron